Home » BENEFITS OF TIMBER FRAME FOR BUILDERS
- No setting out to do. Builder agrees soleplate layout with architect – that’s it!
- Using Eco-joists and Stud walls 1st Fix electrics complete 1 day (3 bed bungalow)
- Same with plumbing 1st fix 1 day completion
- Builder does not have to wait for any drying out time.
- No chasing out concrete walls pipes/cables runs internally and provided for.
- No possibility of other trades puncturing hidden pipes or cables.
- No waste on site to lower margins.
- Several internal trades can work at once – even if outside skin is not complete.
- Massive saving on subcontract labour as average build time is 12-16 weeks for a 4 bed house
- Sub-contractors can’t make costly mistakes once TF is erected.
- No plaster basecoats required internally.
- Joiners input greatly reduced due to off-site manufacture.
- Cleaner and more organised site than traditional
- Reduces need for timber stock and theft.
- No temporary internal bracing required.
- Stage payment from clients much faster
- Less interest to pay at bank, due to speed of erection
- Fast rotation of sub-contractors on multi-site.
- Ideal lightweight construction on poor ground conditions
- All warranties in place PRIOR to commencement.
- Progress is not weather dependent.
- Internal partitions easily removed/added.
- Extra flues/windows/doorways easily made.
- Removes our cladding from critical path
- Reduces materials handling on site
- Reduces need for closed storage containers
- Reduces crane movement on site.
- Safer to work on than traditional construction
- Improved site productivity
- Dimensionally accurate, all walls straight and square.
- Above makes decorating much faster.
- Builders budget is guaranteed
- Contributes to eco-home status.
- Eco’s can be used as flat roof – fixed 1 day.
- Open spans up to 22m, removes need for steel.
- No defect responsibility to builder.
- Roof trusses supply immediate solution to complex roofscapes
- Eco’s can be suspended on top or bottom chord, allowing greater tolerance.
- 72mm chord provides a large decking fixing point.
- Depths of Eco’s compatible with other joists materials
- No sinking or swelling
- No drilling or notching, or chasing which reduces integrity.
- Erected in ½ time of conventional joists.
- Much lower impact sound levels.
- Snagging list greatly reduced
- Builder’s call-backs unlikely.
- No dependency on design mixes
- No dependency on multi-concrete deliveries.
- Floors joisted and decked.
- No drying out means no cracking and no call-backs.