A FRAME BLOCK REINFORCING


As the structure is so big a lot of reinforcing blocks have to be inserted all through the building.

For these we used off cuts from the laminate beams.

Improvised workbench made from pallets.

The rest were pressure treated off cuts from a previous job.

Where the A Frames rested on the laminate ring beams we place the laminate off cuts. They were fixed using a coach bolt and 4 screws.

Eventually the whole floor will be covered with boarding so floor noggins needed to be fixed every 120 cms.

To close up the beams for a tight fit clamps were used.

The bootom are also going to get covered and insulation goes in between.

On the underside of the exterior T&G also needs to be added.

 

 

Under construction.

ll